STARBUCKS COFFEE SHOP
Case Study Project

Project:

Marinopoulos Coffee Company with the opening of its 13th Starbucks® store on the island, located in the new Polemidia Shopping Center in Limassol.

SOLUTION:

LG was called upon to provide a solution for air conditioning. Cond-Air Ltd had proceed with the installation. MULTI V5 Variable Refrigerant Flow (VRF) system was installed with ceiling concealed ducted types indoor Units (medium static),Heat Recovery Ventilator and Split-type machinery.

The air conditioning system was completed by the addition of the central controller AC EZ Central Controller able to control up to 32 Units.

Media Gallery:

Scroll to Top