Akti Beach Village Resort
Case Study Project

Project:

Akti Beach Village Resort was built in 2002 and features Byzantine architecture.

SOLUTION:

The hotel needed an extension to provide restaurants and more rooms. LG was called upon to provide a solution for air conditioning . LG supplied the machinery and in Cooperation with KHS THERMOCOOL LTD we proceed with the mechanical installation.

Τhe ideal solution was to use VRF MULTI V5 units with indoor units  set to be ceiling concealed ducted types – medium static . In addition to optimizing installation control, the air conditioning system was designed to be controlled by an AC SMART central controller providing a high-demand, integrated HVAC system.

Media Gallery:

Scroll to Top